linkedin

Control & Services Buoy

Challenge

The control of and fluids injection at wells requires a long umbilical, which together with the host facility modifications and high pumping pressures can be a high CAPEX and OPEX cost.

Long Umbilical Challenge

Solution

Our Smart Buoy can be used close to well locations, since there is no weather-vaning and a small mooring footprint. This allows the Buoy to be used in a hydrocarbon free mode with either a telemetry link or fibre-optic link through a subsea umbilical back to the host facility.

For example of how our concepts can provide your solutions please click the images.

Control & Service Buoy